丁香婷婷久久久综合精品国产,国产激情电影综合在线看,日韩一区二区三区射精,久免费视频

銷售咨詢熱線
15953126901
18615254757
公司新聞 hengye
企業(yè)案例 case

聯(lián)系我們

  • 聯(lián)系人:濟(jì)南燕翔鐵藝制品有限公司
  • 手機(jī):15953126901
  • 電話:18615254757
  • 郵箱:785385551@qq.com
  • 地址:濟(jì)南市天橋區(qū)歷山北路黃臺(tái)不銹鋼市場(chǎng)3區(qū)317
當(dāng)前位置: 首頁(yè) > 新聞資訊>公司新聞安裝鐵藝護(hù)欄應(yīng)該注意的哪些問題

安裝鐵藝護(hù)欄應(yīng)該注意的哪些問題

來源:http:// 日期:2024-07-04 發(fā)布人: 瀏覽次數(shù):1

一、預(yù)埋件設(shè)計(jì)標(biāo)高、位置、數(shù)量須符合設(shè)計(jì)及安裝要求,并經(jīng)防腐防銹處理。埋件不符合要求時(shí),應(yīng)及時(shí)采取有效措施,增補(bǔ)埋件。這一點(diǎn)特別重要,大家也都知道預(yù)埋鐵應(yīng)該開始就要做好的工序。

1、 The design elevation, position, and quantity of embedded parts must meet the design and installation requirements, and undergo anti-corrosion and rust prevention treatment. When the embedded parts do not meet the requirements, effective measures should be taken in a timely manner to supplement the embedded parts. This is particularly important, as we all know that pre embedding iron should be done from the beginning.

二、安裝鐵藝護(hù)欄立桿的部位時(shí),基層混凝土不得有酥松現(xiàn)象,并且安裝標(biāo)高應(yīng)符合設(shè)計(jì)要求,凹凸不平處必須剔除或修補(bǔ)平整,過凹處及基層蜂窩麻面嚴(yán)重處,不得用水泥砂漿修補(bǔ),應(yīng)用高強(qiáng)混凝土進(jìn)行修補(bǔ),并待有一定強(qiáng)度后,方可進(jìn)行鐵藝護(hù)欄的安裝。

2、 When installing the upright pole of the wrought iron guardrail, the base concrete should not have any looseness, and the installation elevation should meet the design requirements. Uneven and uneven areas must be removed or repaired flat. Over concave areas and areas with severe honeycomb and rough surfaces on the base should not be repaired with cement mortar. High strength concrete should be used for repair, and the installation of the wrought iron guardrail can only be carried out after a certain strength is achieved.

誠(chéng)信不銹鋼鐵藝加工廠再次提醒您:一定要按規(guī)程安裝,才能保證我們的,不合格的安裝鐵藝護(hù)欄,會(huì)存在很多隱患,大家一定要防止。因?yàn)樯攀侵匾摹?/p>

Integrity Stainless Steel and Iron Processing Factory reminds you once again: it is necessary to install according to regulations to ensure our safety. Installing iron guardrails that are not qualified will pose many hidden dangers, and everyone must prevent them. Because life is the most important thing.

下面我給大家總結(jié)以下鐵藝護(hù)欄安裝時(shí)所需要注意的幾點(diǎn)具體細(xì)節(jié)要求:

Below, I will summarize the specific details that need to be paid attention to when installing wrought iron guardrails:

一、鐵藝護(hù)欄到達(dá)施工現(xiàn)場(chǎng)后按圖紙上所規(guī)定的位置及尺寸準(zhǔn)確安裝就位,確定好標(biāo)高及垂直平整度。應(yīng)按照甲方要求與圖紙?jiān)O(shè)計(jì)要求進(jìn)行定位,確保達(dá)到設(shè)計(jì)要求與驗(yàn)收規(guī)范。

1、 After arriving at the construction site, the wrought iron guardrail shall be accurately installed in place according to the position and size specified on the drawings, and the elevation and vertical flatness shall be determined. The positioning should be carried out according to the requirements of Party A and the design requirements of the drawings to ensure that the design requirements and acceptance specifications are met.

二、預(yù)埋件安裝根據(jù)圖紙?jiān)O(shè)計(jì)要求和施工現(xiàn)場(chǎng)的實(shí)際情況準(zhǔn)確無誤的定位,避免造成不在一條平行線上。

2、 The installation of embedded parts should be accurately and precisely positioned according to the design requirements of the drawings and the actual situation of the construction site, to avoid not being on a parallel line.

三、鐵藝護(hù)欄所提供的標(biāo)準(zhǔn)線抄水平定位安裝,預(yù)埋間距根據(jù)樓梯踏步數(shù)量及圖紙?jiān)O(shè)計(jì)要求,安裝定位。

3、 The standard line provided by the wrought iron guardrail is horizontally positioned for installation, and the embedded spacing is determined based on the number of stair steps and the design requirements of the drawings.

20230121061258535.jpg

四、安裝偏差必須符合規(guī)定和設(shè)計(jì)要求,達(dá)到驗(yàn)收標(biāo)準(zhǔn)。

4、 The installation deviation must comply with national regulations and design requirements, and meet the acceptance standards.

五、預(yù)埋件、鐵藝欄桿安裝必須牢固,安裝偏差根據(jù)規(guī)定和設(shè)計(jì)要求:扶手直線度<3mm,垂直度<3mm,欄桿間距誤差<3mm,對(duì)角線誤差<3mm,預(yù)埋件垂直誤差<3mm,水平誤差<3mm。

5、 The installation of embedded parts and wrought iron railings must be firm, and the installation deviation should comply with national regulations and design requirements: the straightness of the handrail should be less than 3mm, the verticality should be less than 3mm, the spacing error between railings should be less than 3mm, the diagonal error should be less than 3mm, the vertical error of embedded parts should be less than 3mm, and the horizontal error should be less than 3mm.

六、預(yù)埋件安裝定位準(zhǔn)確無誤經(jīng)驗(yàn)收后刷兩道防銹漆,再進(jìn)行鐵藝護(hù)欄安裝。

6、 After the installation and positioning of the embedded parts are accurate and verified, two coats of anti rust paint will be applied before installing the wrought iron guardrail.

七、鐵藝護(hù)欄安裝完成后,接部位打磨光滑,刷兩道防銹漆,經(jīng)驗(yàn)收后再做表面一致處理。

7、 After the installation of the wrought iron guardrail is completed, the joint should be polished smooth and coated with two layers of anti rust paint. After acceptance, the surface should be treated uniformly.

八、鐵藝護(hù)欄安裝運(yùn)輸過程中,為防止陽(yáng)臺(tái)欄桿的擦傷損壞,應(yīng)做包裝防護(hù)。

8、 During the installation and transportation of wrought iron guardrails, packaging protection should be provided to prevent scratches and damage to balcony railings.